Starter Relay [Skyactiv G 2.0]
GeneralClutch Pedal Position (CPP) Switch [Skyactiv G 2.0]
Purpose/Function
Detects the connection status of the clutch.
Construction
Installed on the clutch pedal.
An ON/OFF type switch has been adopted.
Operation
Inputs the CPP switch on/off signal to the PCM.
The contact point is on and voltage ...
Climate Control Unit Inspection [Manual Air Conditioner]
1. Remove the climate control unit with the connector connected..
2. Switch the ignition ON (engine off or on).
3. Connect the negative (-) lead of the tester to the body ground.
4. By inserting the positive (+) lead of the tester into the climate control
unit connector, measure the voltage ...
Rear Wiper Arm And Blade Removal/Installation
Rear Wiper Arm
1. Pull the cap in the direction of the arrows (1) shown in the figure and remove
it in the direction of the arrow (2) with tabs A, B released.
2. Remove the nut with the rear wiper arm and blade pressed.
3. Raise the rear wiper arm and detach it from the serrated conne ...