Resistance Inspection
1. Disconnect the negative battery cable..
2. Disconnect the throttle body connector.
3. Measure the resistance between throttle body terminals E and F.
1.38 ohms [20°C {68 °F}]
If not as specified, replace the throttle body..
Magnetic Clutch Adjustment [Full Auto Air Conditioner]
1. Measure the clearance around the entire circumference between the pressure
plate and A/C compressor pulley using a thickness gauge.
2. Verify the clearance.
If not within the specification, remove the pressure plate and adjust the
clearance by changing the shim (0.2 mm {0.008 i ...
Positive Crankcase Ventilation (PCV) Valve
Purpose, Function
Prevents release of blow-by gas (unburnt gas) into the atmosphere.
The PCV valve is open/closed by the intake manifold vacuum.
Construction
The PCV valve is installed to the oil separator.
The PCV valve consists of a spring and valve.
...
Clock Spring Inspection [Two Step Deployment Control System]
1. Disconnect the negative battery cable and wait for 1 min or more..
2. Remove the driver?side air bag module..
3. Remove the steering wheel..
4. Remove the column cover..
5. Remove the clock spring..
6. Verify that the continuity is as indicated in the table.
If not as indicated ...