Resistance Inspection
1. Disconnect the negative battery cable..
2. Remove the plug hole plate..
3. Disconnect the fuel injector connector.
4. Inspect the resistance between fuel injector terminals A and B.

1.74—2.04 ohms [20 °C {68 °F}]
If not within the specification, replace the fuel injector..
Fuel Injection Control System
Fuel Injector RelayPower Brake Unit
Purpose/Function
A 9.8-inch, single diaphragm type power brake unit has been adopted, achieving
compatibility between high braking performance and excellent brake feeling.
Construction
The power brake unit cannot be disassembled. Therefore, if there is any malfunction
in th ...
Body Panel
Outline
The multi-load path and triple H-shaped structure of distributing the power
absorbed at the collision were used for the body shell.
A ring structure has been adopted for the triple H structure, realizing top-level
crash safety performance.
Crushable structure fro ...
Instrumentation/Driver Info. Personalization Features Setting Procedure
1. Connect the M-MDS to the DLC-2.
2. After vehicle identification, select the following from the M-MDS initialization
screen.
a. “Module programming“
b. “Programmable Parameters”
3. Select menu in the “IC”.
4. Select an item name, and than select option.
Instrument cluster ...