Symbol Mark

Removal Procedure
1. Drill the 4 locations shown in the figure.
NOTE:
When drilling the 4 locations shown in the figure, do not drill a hole all the way through or there could be a problem when installing the new part.

2. Remove the shroud upper reinforcement.
Shroud Upper Reinforcement Installation [Panel Replacement]
Water Pump Removal/InstallationFront Drive Shaft Inspection
1. Inspect the connections for any looseness.
If there is any malfunction, tighten or replace the applicable part.
2. Inspect the dust boot for damage and cracks.
If there is any malfunction, replace the applicable part.
3. Move the spline and joint up and down, left ...
Main Relay Control [Skyactiv G 2.0]
Outline
Supplies power to each part by switching the main relay on/off at the optimal
timing according to the vehicle conditions.
Block Diagram
Operation
When the ignition is switched ON, the main relay turns on and electrical
power is supplied to each sensor and devic ...
Check Valve Inspection
Except U.S.A. And CANADA
1. Remove the check valve..
2. Verify that there is no airflow when positive pressure is applied to port
A.
If there is airflow, replace the check valve..
3. Verify that there is no airflow when negative pressure is applied to port
A.
If ther ...