1. Remove the air cleaner element as shown in the figure.

2. Install in the reverse order of removal.
Air Cleaner Element Inspection
Air CleanerStarter Relay [Skyactiv G 2.0]
Purpose, Function
The starter relay supplies power to the starter by receiving the signal from
the PCM.
Construction
The starter relay is installed to the relay and fuse block.
Operation
The contact point is on when the voltage is supplied to the coil based on
...
Pressure Control Valve Inspection [Skyactiv G 2.0]
1. Remove the pressure control valve assembly..
CAUTION:
Do not apply a pressure 36 kPa {0.37 kgf/cm2, 5.2 psi} or more. Doing so
will damage the pressure control valve and evaporative hose.
2. Apply a pressure of 36 kPa {0.37 kgf/cm2, 5.2 psi} to port A.
3. Verify that ther ...
Oil Filter
Purpose, Function
Engine oil is filtered by passing engine oil through the oil filter element.
Construction
The oil filter is installed on the right side surface of the cylinder block.
A spin-on type (full-flow type) oil filter has been adopted.
The bypa ...