Chevrolet Spark manuals

Mazda CX-5 Service & Repair Manual: Engine Coolant Temperature (ECT) Sensor

Mazda CX-5 Service & Repair Manual / Engine / Cooling / Engine Coolant Temperature (ECT) Sensor

Purpose/Function

Construction

ECT sensor No.1

ECT sensor No.2

Operation

ECT sensor characteristic


Fail-safe

ECT sensor No.1


DTC No.

Fail-safe function

P0117:00

  • Fixes the water temperature for the engine control at 40 °C {104 °F}, and for the idle air control at 80 °C {176 °F}.

  • Operates the cooling fan (high speed rotation).

  • Inhibits the fuel cut control during shift change.

P0118:00

  • Fixes the water temperature for the engine control at 40 °C {104 °F}, and for the idle air control at 80 °C {176 °F}.

  • Operates the cooling fan (high speed rotation).

  • Inhibits the fuel cut control during shift change.


ECT sensor No.2

Engine Coolant Temperature (ECT) Sensor Removal/Installation
WARNING: When the engine is hot, it can badly burn. Turn off the engine and wait until it is cool before removing the ECT sensor. ECT Sensor No.1 1. Disconnect the negative battery c ...

Fan Switch Inspection [Manual Air Conditioner]
1. Disconnect the negative battery cable.. 2. Remove the following parts: a. Shift lever knob (MTX). b. Glove compartment. c. Front console box. d. Shift panel. e. Upper panel. f. Rear c ...

Other materials:

Main Relay Control [Skyactiv G 2.0]
Outline Supplies power to each part by switching the main relay on/off at the optimal timing according to the vehicle conditions. Block Diagram Operation When the ignition is switched ON, the main relay turns on and electrical power is supplied to each sensor and devic ...

Cruise Main Indicator Light (Amber)
Purpose/Function Illuminates while the cruise control system is in standby mode to inform the driver that the cruise control system is on standby. Construction Built into the instrument cluster. Operation Illuminates while the cruise control system is on sta ...

Charcoal Canister Inspection
U.S.A. And CANADA Leakage inspection 1. Perform the following procedures: Do not operate CV solenoid valve. Assemble the hose used for inspection to port A. Cover ports B and C with the caps. CAUTION: Do not apply a pressure 20 kPa {150 mmHg, 5.91 inHg} o ...

© 2016-2026 Copyright www.mcx5.org