Steering Switch Removal/Installation
Electric Power Steering (Eps) Control ModuleBattery [Skyactiv G 2.0]
Purpose, Function
The battery stores electricity generated by the generator. In addition, it
supplies power to electronic devices if necessary.
Construction
The battery is installed in the engine compartment. (vehicle left)
Fail-safe
Function not equipped.
...
Inspection Of SST (Deployment Tool) [Standard Deployment Control System]
1. Before using the SST (49 H066 002), inspect its operation.
Inspection Procedure
1. Follow the steps below to inspect the SST (49 H066 002).
If not as indicated in the table, replace the SST (49 H066 002) because
it has a malfunction.
WARNING:
Do not use a malfu ...
Air Bag Module And Pre Tensioner Seat Belt Disposal Procedures [Standard Deployment
Control System]
WARNING:
A live (undeployed) air bag module or pre-tensioner seat belt may accidentally
operate (deploy) when it is disposed of and cause serious injury. Always refer
to the “AIR BAG MODULE AND PRE-TENSIONER SEAT BELT DEPLOYMENT PROCEDURES” and
dispose of air bag modules and pre ...