1. Inspect the steering column for excessive play and damage.
2. Verify that the clearance between the projection on the steering column shown in the figure and the bracket is less than 2.0 mm {0.079 in}
.

If the clearance between the projection and bracket is 2.0 mm {0.079 in} or more
, replace the steering column component.
NOTE:
If the clearance between the projection and bracket is 2.0 mm {0.079 in} or more
, the impact absorbing mechanism of the steering column will operate, therefore it is necessary to replace the steering column component.
3. Inspect the tilt/telescope mechanism operation for the following:

a. The adjusting lever moves smoothly from the lock to the unlock position.
b. The steering shaft is fixed firmly when the adjusting lever is locked.
If there is any malfunction, replace the steering column.
Pressure Control Valve [Skyactiv G 2.0]
Tie Rod End InspectionRadiator
Purpose, Function
The radiator disperses the engine coolant heat flowing internally by receiving
against the vehicle while it is driven or air flow produced by the cooling fan.
Construction
The radiator is installed to the front of the engine compartment.
Four mounting ...
Oil Control Valve (OCV) Removal/Installation [Skyactiv G 2.0]
WARNING:
A hot engine can cause severe burns. Turn off the engine and wait until it
is cool before servicing.
1. Disconnect the negative battery cable..
2. Remove the plug hole plate..
3. Remove the ignition coil/ion sensors..
4. Remove the cylinder head cover..
5. Remove in ...
Not P Position Switch Inspection
NOTE:
The not P position switch is built into the selector lever component.
1. Disconnect the negative battery cable..
2. Remove the front console..
3. Disconnect the selector lever component connector.
4. Verify that the continuity between selector lever component terminals ...