Roof Molding Removal
Front SeatClutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Continuity Inspection
1. Verify that the CPP switch is installed properly..
2. Disconnect the negative battery cable..
3. Disconnect the CPP switch connector.
4. Verify that the continuity between CPP switch terminals A and B when the clutch
pedal is depressed and when it is released is acc ...
Starter Relay [Skyactiv G 2.0]
Purpose, Function
The starter relay supplies power to the starter by receiving the signal from
the PCM.
Construction
The starter relay is installed to the relay and fuse block.
Operation
The contact point is on when the voltage is supplied to the coil based on
...
Cylinder Head
Outline
With the adoption of the rocker arm (built into needle roller bearing), the
sliding resistance has been reduced.
With the adoption of the HLA, the valve clearance is maintained at 0 mm at
all the times.
The contact point of the rocker arm and cam is lubricated by ...