DSC ControlPID/Data Monitor Inspection [Two Step Deployment Control System]
1. Connect the M-MDS to the DLC-2.
2. After the vehicle is identified, select the following items from the initialization
screen of the M-MDS.
a. Select “DataLogger”.
b. Select “Modules”.
c. Select “RCM”.
3. Select the applicable PID from the PID table.
4. Verify the PID da ...
Power Window System
Outline
A power window system that enables automatic opening/closing of the door
glass has been adopted.
The driver's side door glass can be opened/closed automatically or manually
by operating the power window main switch.
All the door glass can be opened/closed man ...
Shift Panel Removal/Installation
ATX
1. Disconnect the negative battery cable..
2. Selector lever to neutral position.
3. Remove the front console box..
4. Take the shaded area shown in the figure, and remove the shift panel in the
direction of the arrow in the order of (1), (2) while detaching clips A, hook B.
5. D ...