Symbol Mark

Removal Procedure
1. Drill the 27 locations shown in the figure.

2. Remove the corner junction.
Corner Junction Installation [Panel Replacement]
Electric Variable Valve Timing Relay [Skyactiv G 2.0]Discharge Headlight System
Outline
The discharge headlight system utilizes a gas discharge type light to emit
a white light resembling sunlight over a wide area. Also, use of the gas discharge
type light realizes high efficiency, low power consumption lighting.
Structural View
System Wiring Diagram
...
Shift Solenoid No.2 [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
Shift solenoid No.2 adjusts the hydraulic pressure in the 2-6 brake circuit
based on the current demand from the TCM according to the vehicle conditions.
Construction
Shift solenoid No.2 is installed to the solenoid control valve body.
Shift solenoid N ...
Front Center Speaker Inspection
1. Disconnect the negative battery cable..
2. Remove the center speaker grille..
3. Remove the front center speaker..
4. Verify that the resistance between the front center speaker terminals is as
indicated in the table.
If not as indicated in the table, replace the front center ...