Relay And Fuse Block Removal/Installation
Battery Inspection [Skyactiv G 2.0]Cell Phones
Cell Phones Warning
WARNING
Please comply with the legal regulations concerning the use of communication
equipment in vehicles in your country:
Use of any electrical devices such as cell phones, computers, portable radios,
vehicle navigation or other devices by the driver while the vehicle ...
Rear Side Frame Installation [Panel Replacement]
Symbol Mark
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform
with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit p ...
Refrigerant Pressure Check
NOTE:
Measure the refrigerant pressure after approx.10 min have elapsed
from engine start.
1. Install the manifold gauge..
2. Start the engine and warm it up.
3. Set the fan speed MAX HI.
4. Turn the A/C switch on.
5. Set to RECIRCULATE mode.
6. Set the temperature control ...