Power Supply Switching
Electronic Spark Advance Control [Skyactiv G 2.0]Hydraulic Variable Valve Timing Control
Outline
Changes the exhaust valve timing according to engine operation conditions
to improve engine output, fuel economy, and emission performance.
Based on each input signal, the PCM determines the optimum exhaust valve
timing according to the engine operation conditions. The P ...
Cooling Fan Relay [Skyactiv G 2.0]
Purpose, Function
The cooling fan relay operates by receiving the signal from the PCM to supply
power to the cooling fan motor.
Construction
The cooling fan relay is installed on the relay and fuse block.
Operation
The contact point is on when the battery vo ...
Clock Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Shift lever knob (MTX).
b. Front console box.
c. Shift panel.
d. Upper panel.
e. Rear console.
f. Side wall.
g. Decoration panel.
h. Front console.
i. Glove compartment.
j. Climate control unit.
3. P ...