Outline
Supplies power to each part by switching the main relay on/off at the optimal timing according to the vehicle conditions.
Block Diagram

Operation
When the ignition is switched ON, the main relay turns on and electrical power is supplied to each sensor and device.
When the ignition is switched off from ON, an on-request signal is received from each control (such as drive-by-wire control, electric variable valve timing control) and the main relay turns on for a specified period.
Front Body Control Module (Fbcm) Removal/Installation
Multiplex Communication SystemStarter Interlock Switch Inspection [Skyactiv G 2.0]
CAUTION:
Do not reuse the starter interlock switch if it is removed from the vehicle
even once. Replace with a new starter interlock switch when installing.
1. Disconnect the negative battery cable..
2. Disconnect the starter interlock switch connector.
3. Verify that the contin ...
Vacuum Pump Inspection
1. Pinch open the clamp using pliers and disconnect the vacuum hose from the
vacuum pump..
2. Install the vacuum gauge as shown in the figure, then check the vacuum.
3. Warn up the engine.
If the pressure is less than the specification, inspect for the following.
Malf ...
Fuel Gauge Sender Unit Inspection [Awd]
Fuel gauge sender unit (main)
NOTE:
For the fuel gauge sender unit removal/installation, refer to the fuel pump
removal/installation because the fuel gauge sender unit is integrated with the
fuel pump..
1. Verify that the resistance at fuel gauge sender unit (main) terminals D a ...