Resistance Inspection
1. Disconnect the negative battery cable..
2. Disconnect the throttle body connector.
3. Measure the resistance between throttle body terminals E and F.

1.38 ohms [20°C {68 °F}]
If not as specified, replace the throttle body..
Start Stop Unit Removal/Installation
Throttle BodyOil Jet Valve
Purpose, Function
The oil jet valve injects engine oil on the back of the piston to cool the
piston.
Construction
The oil jet valve is installed into the cylinder block.
The oil jet valve is built into the check ball and spring.
Operation
1. When ...
D Pillar Trim Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Trunk board.
b. Trunk end trim.
c. Rear scuff plate.
d. Trunk side trim.
3. Take the shaded area shown in the figure, and remove the D-pillar trim in
the direction of the arrow in the order of (1), (2), (3) wh ...
Fuel Gauge Sender Unit Removal/Installation [2 Wd]
WARNING:
Always keep sparks and flames away from fuel when servicing the fuel system.
Fuel can be easily ignited which could cause serious injury or death, and damage
to equipment.
Fuel line spills and leakage from the pressurized fuel system are dangerous.
Fuel can ignite a ...