1. Disconnect the negative battery cable..
2. Remove the front bumper..
3. Disconnect the hood latch switch connector..
4. Verify that the continuity is as indicated in the table.
NOTE:
Inspect the continuity when the hood is open and closed.
If the operation as indicated in the table cannot be verified, replace the hood latch.
High Pressure Fuel Pump Control
Outline
Changes the fuel pressure applied to the fuel injector according to engine
operation conditions to improve engine output and startability.
The PCM determines the fuel pressure value corresponding to the engine operation
conditions based on the each input signal, and driv ...
Accelerator Pedal Removal/Installation
1. Disconnect the negative battery cable..
2. Remove in the order indicated in the table.
1
APP sensor connector
2
Accelerator pedal
3. Install in the reverse order of removal. ...
Barometric Pressure (Baro) Sensor Inspection
Voltage Inspection
NOTE:
Because the BARO sensor is integrated in the PCM, replacing the BARO sensor
includes replacement of the PCM.
1. Connect the M-MDS to the DLC?2.
2. Switch the ignition ON (engine off or on).
3. Verify that the BARO sensor output voltage (PID: BARO) is wi ...