Purpose/Function
The R-3-5 brake operates in 3GR, 5GR and in reverse to lock the reduction internal gear against rotation.
Construction
The R-3-5 brake consists of the following parts shown in the figure.

The driven plate of the R-3-5 brake does not rotate because it is connected to the end cover component.

The R-3-5 brake drive plate is engaged with the R-3-5 brake hub and reduction internal gear, and locks the reduction internal gear.

For the R-3-5 brake piston, a compact and highly reliable bonded seal piston has been adopted in which the piston and seal are molded together.
Operation
When hydraulic pressure is applied to the R-3-5 brake piston, the drive plate and driven plate are pressure bonded to lock the reduction internal gear.

Power Brake Unit Removal/Installation
Vacuum Hose Removal/InstallationVacuum Pump Removal/Installation
1. Remove the plug hole plate..
2. Remove the battery..
3. Set the PCM wiring harness out of the way.
4. Disconnect the vacuum hose from the vacuum pump..
5. Remove in the order shown in the table.
6. Install in the reverse order of removal.
1
Vacuum hose
...
Differential Oil Temperature Sensor Removal/Installation
WARNING:
Hot differential oil may cause severe burns. Do not perform maintenance while
differential oil is hot.
1. Disconnect the negative battery cable.
2. Disconnect the differential oil temperature sensor connector.
3. Remove the differential oil temperature sensor.
4. ...
Purge Solenoid Valve
Purpose, Function
Introduces evaporative gas absorbed by the charcoal canister to the intake
manifold.
The purge solenoid valve opens according to the control signal from the PCM.
Construction
The purge solenoid valve is installed in the engine compartment.
...