Purpose/Function
Detects the connection status of the clutch.
Construction
Installed on the clutch pedal.

An ON/OFF type switch has been adopted.
Operation
Inputs the CPP switch on/off signal to the PCM.

The contact point is on and voltage is output when the clutch pedal is engaged, and off when the clutch pedal is not engaged.

Fail-safe
Function not equipped.
Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Clutch Pedal Position Switch Removal/Installation [C66 M R]Liftgate Garnish Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Liftgate upper trim.
b. Liftgate side trim.
c. Liftgate recess.
d. Liftgate lower trim.
3. Disconnect the connectors.
4. Remove nuts A.
5. Detach clips B shown in the figure.
6. Remove the liftgate ...
Inspection Of SST (Deployment Tool) [Standard Deployment Control System]
1. Before using the SST (49 H066 002), inspect its operation.
Inspection Procedure
1. Follow the steps below to inspect the SST (49 H066 002).
If not as indicated in the table, replace the SST (49 H066 002) because
it has a malfunction.
WARNING:
Do not use a malfu ...
Keyless Beeper Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the cowl grille..
3. Disconnect the connector.
4. Pull the keyless buzzer in the direction of the arrow (2) shown in the figure
while pressing the keyless buzzer tab in the direction of the arrow (1) shown in
the figure, detach the k ...