Body Sealing
Apply body sealer where necessary.
For locations where application of body sealer is difficult after installation, apply it before installation.

Application of Undercoating
Apply an undercoat to the required location of the body.

Application of Rust Inhibitor
Apply rust inhibitor (wax, oil, etc.) to the back of the welded areas.

Application of Dumping Sheet
Apply dumping sheet by heating with an infrared ray lamp.

A Pillar Trim Removal/Installation
B Pillar Lower Trim Removal/InstallationFuel Gauge Sender Unit Inspection [2 Wd]
NOTE:
For the fuel gauge sender unit removal/installation, refer to the fuel pump
removal/installation because the fuel gauge sender unit is integrated with the
fuel pump..
1. Verify that the resistance at fuel gauge sender unit terminals D and C is
as indicated in the table ac ...
Fuel Gauge Sender Unit Removal/Installation [2 Wd]
WARNING:
Always keep sparks and flames away from fuel when servicing the fuel system.
Fuel can be easily ignited which could cause serious injury or death, and damage
to equipment.
Fuel line spills and leakage from the pressurized fuel system are dangerous.
Fuel can ignite a ...
Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Continuity Inspection
1. Verify that the CPP switch is installed properly..
2. Disconnect the negative battery cable..
3. Disconnect the CPP switch connector.
4. Verify that the continuity between CPP switch terminals A and B when the clutch
pedal is depressed and when it is released is acc ...