Outline
The PCM controls energization to the starter relay according to an immobilizer system request to improve security.
While not in P or N position, the starter relay energization by the ignition key is inhibited. (ATX)
While not in neutral, the starter relay energization by the push button start is inhibited. (MTX)
Block Diagram

Operation
The PCM establishes a ground to the starter circuit. Therefore when the ignition is switched to START, the starter relay is energized and the starter motor rotates. As a result, the engine starts normally.
The PCM does not establish a ground to the starter circuit. Therefore, even if the ignition switch is turned to the start position, the starter motor does not rotate because the starter relay does not energize, and the engine does not start.

The PCM turns the starter relay off with the engine speed at the set value or more (value from engine coolant temperature fluctuates).
Refrigerant Charging
Starter Disassembly/Assembly [Skyactiv G 2.0]Passenger Compartment Temperature Sensor Removal/Installation [Full Auto Air
Conditioner]
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Front scuff plate (driver-side).
b. Front side trim (driver-side).
c. Switch panel.
d. Decoration panel.
e. Shift lever knob (MTX).
f. Front console box.
g. Shift panel.
h. Upper panel.
i. Rear console. ...
Front Brake (Disc) Removal/Installation
1. Remove in the order indicated in the table.
2. Install in the reverse order of removal.
3. After installation, add brake fluid, bleed the air, and inspect for fluid
leakage..
4. Depress the brake pedal a few times, rotate the wheel by hand, and verify
that the brake does not drag.
...
Torque Box Installation [Panel Replacement]
Symbol Mark
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform
with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit p ...