1. Connect the M-MDS to the DLC?2.
2. After the vehicle is identified, select the following items from the initialization screen of the M-MDS.
a. Select “DataLogger”.
b. Select “Modules”.
c. Select “RCM”.
3. Select the applicable PID from the PID table.
4. Verify the PID data according to the directions on the screen.
NOTE:
The PID data screen function is used for monitoring the calculated value of input/output signals in the module. Therefore, if the monitored value of the output parts is not within the specification, it is necessary to inspect the monitored value of input parts corresponding to the applicable output part control. In addition, because the system does not display an output part malfunction as an abnormality in the monitored value, it is necessary to inspect the output parts individually.
PCM
PID/Data Monitor Inspection [Start Stop Unit]Hood Release Cable Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Front bumper.
b. Front combination light (LH).
c. Front mudguard (LH).
d. Hood release lever.
3. Disconnect the hood release cable from the hood latch.
4. While pressing the tabs of the clip in the direction o ...
Drive Belt [Skyactiv G 2.0]
Purpose, Function
The drive belt transmits rotation force of the crankshaft pulley to the pulley
for the auxiliary parts.
Construction
The drive belt is installed to the front of the engine.
A V-ribbed belt has been adopted for the drive belt.
The wat ...
Shift Solenoid No.4 [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
Shift solenoid No.4 adjusts the hydraulic pressure in the high clutch circuit
and the low and reverse brake circuit based on the current demand from the TCM
according to the vehicle conditions.
Construction
Shift solenoid No.4 is installed to the solenoid c ...