1. Connect the M-MDS to the DLC?2.
2. After the vehicle is identified, select the following items from the initialization screen of the M-MDS.
Select “DataLogger”.
Select “Modules”.
Select “SSU”.
3. Select the applicable PID from the PID table.
4. Verify the PID data according to the directions on the screen.
NOTE:
The PID data screen function is used for monitoring the calculated value of input/output signals in the module. Therefore, if the monitored value of the output parts is not within the specification, it is necessary to inspect the monitored value of input parts corresponding to the applicable output part control. In addition, because the system does not display an output part malfunction as an abnormality in the monitored value, it is necessary to inspect the output parts individually.
When detecting DTCs, PIDs related to a malfunctioning system may not display even if the module is normal. Therefore, if a PID is not displayed, it is necessary to verify the DTC, perform malfunction diagnosis of the DTC that was detected, and do repairs.
PID/Data Monitor Inspection [Standard Deployment Control System]
PID/Data Monitor Inspection [Two Step Deployment Control System]Air Intake Actuator Inspection [Manual Air Conditioner]
1. Connect battery positive voltage to air intake actuator terminal B (or C),
connect terminal C (or B) to ground, and then verify that the air intake actuator
operates as shown in the table.
If the operation condition is not normal, replace the air intake actuator.
...
Fuel Pump Relay
Purpose, Function
Controls the fuel pump on/off according to control signals from the PCM.
The fuel pump is operated only at engine start or when the engine is running
to improve safety.
Construction
The fuel pump relay is installed in the relay and fuse block.
...
Tie Rod End Inspection
1. Inspect the tie-rod end for damage and the boot for cracks.
If there is any malfunction, replace the tie-rod end.
2. Inspect for excessive play.
If there is any malfunction, replace the tie-rod end.
3. Rotate the tie-rod end five times.
4. Install two nuts to the ba ...