Chevrolet Spark manuals

Mazda CX-5 Service & Repair Manual: Intake Air Temperature (Iat) Sensor Inspection

Mazda CX-5 Service & Repair Manual / Engine / Intake / Intake Air Temperature (Iat) Sensor Inspection

IAT Sensor No.1

Resistance inspection

NOTE:

1. Disconnect the negative battery cable..

2. Disconnect the MAF sensor/IAT sensor No.1 connector.

3. Measure the resistance between MAF sensor/IAT sensor No.1 terminals A and B.


Specification


IAT (°C {°F})

Resistance (Kilohms)

?20 {?4}

13.7—16.6

20 {68}

2.49—2.79

60 {140}

0.622—0.703



IAT Sensor No.2

Resistance inspection

NOTE:

1. Disconnect the negative battery cable..

2. Disconnect the MAP sensor/IAT sensor No.2 connector.

3. Remove the MAP sensor/IAT sensor No.2..

4. Measure the resistance between MAP sensor/IAT sensor No.2 terminals A and B.


Specification


IAT (°C {°F})

Resistance (Kilohms)

0 {32}

Approx. 5.9

20 {68}

2.375—2.625

80 {176}

Approx. 0.323

130 {266}

Approx. 0.0893



Intake Air System
Purpose, Outline A vacuum pump has been adopted which supplies stable vacuum to the power brake unit. Structural View System Diagram Vacuum Hose Routing Diagram Structur ...

Intake Air Temperature (Iat) Sensor
IAT Sensor No.1 Purpose/Function Detects the IAT before it passes through the throttle body as basic information for mainly determining the fuel injection amount. Detects the IAT be ...

Other materials:

Front Door Hinge Removal/Installation
1. Disconnect the negative battery cable.. 2. Remove the following parts: a. Front bumper. b. Front combination light. c. Front bumper slider. d. Front over fender. e. Front fender panel. f. Front door. 3. Remove in the order shown in the figure. 1 Bolt ...

Clock Removal/Installation
1. Disconnect the negative battery cable.. 2. Remove the following parts: a. Shift lever knob (MTX). b. Front console box. c. Shift panel. d. Upper panel. e. Rear console. f. Side wall. g. Decoration panel. h. Front console. i. Glove compartment. j. Climate control unit. 3. P ...

Refrigerant Pressure Sensor Inspection [Full Auto Air Conditioner]
1. Install the manifold gauge. 2. Verify the high-pressure side reading of the manifold gauge. 3. Measure the terminal voltage at PCM terminal 2BB, 2AX and 2AJ 4. Using the graph below, measure and verify the terminal voltages at 2AX. 5. Follow the PCM inspection when measuring the other te ...

© 2016-2019 Copyright www.mcx5.org