Chevrolet Spark manuals

Mazda CX-5 Service & Repair Manual: Clock Input/Output Check Mode

Activation procedure


Inspection

NOTE:


Item

Check content

All LCD illuminated

LCD indication

Check code 1

MS-CAN BUS OFF occurrence

Check code 2

Communication between instrument cluster

Check code 6

Ignition switch ON/OFF signal


All LCD illuminated


Inspection

Display

Action

  • Activate the clock input/output check mode.

  • Are all segments and dots on the LCD illuminated?


Yes

LCD display is normal.

No

Replace the clock.

(See CLOCK INSPECTION.)


Check code 1


Inspection procedure

Display

Action

  • Press the H button to display check code 1.

  • Verify the screen display.


There is no MS-CAN BUS OFF error (normal)


There is an MS-CAN BUS OFF error (malfunction)

Perform the malfunction diagnosis for the MS-CAN referring to the following:

(See FOREWORD.)


Check code 2


Inspection procedure

Display

Action

  • Press the H button to display check code 2.

  • Verify the screen display.


There is no communication error between the instrument cluster.


There is a communication error between the instrument cluster.

Perform the malfunction diagnosis for the MS-CAN referring to the following:

(See FOREWORD.)


Check code 6


Inspection procedure

Display

Action

Step 1

  • Press the H button to display check code 6.

  • Switch the ignition ON (engine off or on).

  • Verify the screen display.


Go to the next step.


Refer to the clock inspection and verify the terminal voltage at clock terminal A.

.

  • Replace the clock if the voltage is B+.

    (See CLOCK REMOVAL/INSTALLATION.)

  • Inspect the following parts if the voltage is 1.0 V or less.

    • METER1 10 A fuse

    • IG relay

    • Related wiring harness

Step 2

  • Switch the ignition off (LOCK).

  • Verify the screen display.


Ignition switch ON/OFF signal is normal.


Refer to the clock inspection and verify the terminal voltage at clock terminal A.

.

  • Replace the clock if the voltage is 1.0 V or more.

    (See CLOCK REMOVAL/INSTALLATION.)

  • Inspect the following parts if the voltage is B+.

    • METER1 10 A fuse

    • IG relay

    • Related wiring harness


Clock
Purpose The clock displays the current time, the passenger and rear seat belt status, the passenger air bag deactivation (PAD) switch status, and the seat warmer operation status to notif ...

Clock Inspection
1. Disconnect the negative battery cable.. 2. Remove the following parts: a. Shift lever knob (MTX). b. Front console box. c. Shift panel. d. Upper panel. e. Rear console. f. Side wall. ...

Other materials:

Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Continuity Inspection 1. Verify that the CPP switch is installed properly.. 2. Disconnect the negative battery cable.. 3. Disconnect the CPP switch connector. 4. Verify that the continuity between CPP switch terminals A and B when the clutch pedal is depressed and when it is released is acc ...

Power Window Motor Inspection
Front driver side 1. Disconnect the negative battery cable.. 2. Remove the inner garnish.. 3. Remove the front door trim.. 4. Disconnect the power window motor connector. 5. Apply battery positive voltage and connect the ground to power window motor terminals E and F, and then inspect the ...

Refrigerant Pressure Sensor Inspection [Full Auto Air Conditioner]
1. Install the manifold gauge. 2. Verify the high-pressure side reading of the manifold gauge. 3. Measure the terminal voltage at PCM terminal 2BB, 2AX and 2AJ 4. Using the graph below, measure and verify the terminal voltages at 2AX. 5. Follow the PCM inspection when measuring the other te ...

© 2016-2026 Copyright www.mcx5.org