Purpose
The system piping connects each related part of the refrigerant system.
Construction
Block-type piping has been adopted to the pipe connection, improving the efficiency of piping related servicing.
The pipes in the piping system consist of the following parts.
Cooler hose (HI)
Cooler hose (LO)
Cooler pipe
The pipes in the piping system are made of aluminum alloy and the hoses are made of rubber (flexible hose).
A high-pressure charging valve is located on the cooler pipe (HI) and a low-pressure charging valve is located on the cooler pipe (LO).

Fail-safe
Function not equipped.
Refrigerant Charging
Refrigerant Line Removal/InstallationTire Pressure Monitoring System Initialization Procedure
Perform the tire pressure monitoring system initialization when the following
operations have been performed:
Tire pressures have been adjusted
Tires or wheels have been replaced
Tires have been rotated
DSC HU/CM replaced
DSC HU/CM ...
A/C Compressor
Purpose
The A/C compressor circulates the refrigerant in the refrigerant cycle.
The A/C compressor compresses the gaseous refrigerant atomized by the evaporator,
and by pressurizing the gaseous refrigerant, liquification by the condenser
is facilitated.
Function
The ...
Filament Inspection
1. Switch the ignition ON (engine off).
2. Turn the rear window defroster switch on.
CAUTION:
Directly touching the rear window defroster filament with the lead of the
tester could damage it. Wrap aluminum foil around the end of the lead and inspect
the filament by touching it ...