1. Remove the push button start..
2. Verify that the continuity between the push button start terminals is as indicated in the table.


If the continuity can be verified as indicated in the table, go to the next step.
If not as indicated in the table, replace the push button start..
3. Apply battery positive voltage and connect the ground to the push button start terminals and verify that the LED illuminates as indicated in the table.


If the LED does not illuminate as indicated in the table, replace the push button start..
Pre Delivery Inspection
Push Button Start Removal/InstallationConnecting Rod, Connecting Rod Bearing
Purpose, Function
Connecting rod
The connecting rod transmits the reciprocating movement of the piston to
the crankshaft by engaging the piston pin and crank pin.
Connecting rod bearing
The connecting rod bearing forms an oil film on the outer surface of the
crank pin to p ...
Resistor Removal/Installation [Manual Air Conditioner]
NOTE:
When removing the resistor, perform the procedure in the posture shown in
the figure.
1. Disconnect the negative battery cable..
2. Remove the dashboard under cover..
3. Disconnect the connector.
4. Rotate the resistor (2) while pressing the tab (1).
5. R ...
Air Bag Module And Pre Tensioner Seat Belt Deployment Procedures [Standard Deployment
Control System]
WARNING:
A live (undeployed) air bag module or pre-tensioner seat belt may accidentally
operate (deploy) when it is disposed of and cause serious injury. Do not dispose
of a live (undeployed) air bag module or pre-tensioner seat belt. If the SSTs
(Deployment tool and Adapter harness ...