1. Measure the propeller shaft center runout using the dial gauge.

If it exceeds the maximum specification, replace the propeller shaft as a single component.
0.8 mm {0.031 in}
2. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

If it is not within the specification, replace the propeller shaft.
0.29—1.47 N·m {3.0—14.9 kgf·cm, 2.6—13.0 in·lbf}
Intermediate Shaft Removal/Installation
Propeller Shaft On Vehicle InspectionFuel Gauge Sender Unit Inspection [Awd]
Fuel gauge sender unit (main)
NOTE:
For the fuel gauge sender unit removal/installation, refer to the fuel pump
removal/installation because the fuel gauge sender unit is integrated with the
fuel pump..
1. Verify that the resistance at fuel gauge sender unit (main) terminals D a ...
Solar Radiation Sensor Inspection [Full Auto Air Conditioner]
1. Shine a fluorescent light or expose the solar radiation sensor to natural
sunlight.
2. Connect the positive (+) lead to terminals B, C and negative (-) lead to terminal
A of the solar radiation sensor, and verify that the voltage value is output.
If the voltage is 0 V, replace ...
On/Off Solenoid [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
The on/off solenoid performs switching of the shift valve in the control
valve body according to the vehicle conditions.
Construction
The on/off solenoid is installed to the solenoid control valve body.
The on/off solenoid is a normal open-type on/off ...