1. Measure the propeller shaft center runout using the dial gauge.

If it exceeds the maximum specification, replace the propeller shaft as a single component.
0.8 mm {0.031 in}
2. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

If it is not within the specification, replace the propeller shaft.
0.29—1.47 N·m {3.0—14.9 kgf·cm, 2.6—13.0 in·lbf}
Intermediate Shaft Removal/Installation
Propeller Shaft On Vehicle InspectionShift Position Indicator Light [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
The shift position indicator light indicates the selector lever position.
Construction
The shift position indicator light is built into the instrument cluster.
Operation
The TCM sends a shift position indicator light illumination request signal ...
Supplier Identification Procedure [Audio]
NOTE:
The unit supplier can vary. When asking the supplier (service center) for
repair or replacement, identify the supplier and fill in the Audio Repair Order
Form using the following procedures.
Verification procedure using label or inscribed lettering
1. Disconnect the negati ...
Liftgate Garnish Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Liftgate upper trim.
b. Liftgate side trim.
c. Liftgate recess.
d. Liftgate lower trim.
3. Disconnect the connectors.
4. Remove nuts A.
5. Detach clips B shown in the figure.
6. Remove the liftgate ...