1. Measure the propeller shaft center runout using the dial gauge.

If it exceeds the maximum specification, replace the propeller shaft as a single component.
0.8 mm {0.031 in}
2. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

If it is not within the specification, replace the propeller shaft.
0.29—1.47 N·m {3.0—14.9 kgf·cm, 2.6—13.0 in·lbf}
Intermediate Shaft Removal/Installation
Propeller Shaft On Vehicle InspectionRear Sash Molding Installation
WARNING:
Using a utility knife with bare hands can cause injury. Always wear gloves
when using a utility knife.
NOTE:
Double-sided adhesive tape has already been attached to the new rear sash
molding.
1. When installing a new rear sash molding, follow the procedure ...
Start Stop Unit Inspection
1. Remove the following parts:
a. Column cover.
2. Verify that the voltages of each of the terminals are as indicated in the
terminal voltage table (reference).
If the voltage is not as specified in the terminal voltage table (reference),
inspect the parts under Inspection item(s) a ...
Drive Belt Removal/Installation [Skyactiv G 2.0]
WARNING:
A hot engine can cause severe burns. Turn off the engine and wait until it
is cool before servicing.
NOTE:
Remove/install the drive belt from the underside of the vehicle.
Generator Drive Belt Removal/Installation
CAUTION:
To prevent damage to the dri ...