1. Connect the M-MDS to the DLC-2.
2. After vehicle identification, select the following from the M-MDS initial screen.
“Operational Record”
3. Then, select the following from the screen menu.
“Meter Warning System”
4. Display the instrument cluster operation history according to the screen instructions.
Instrument Cluster Operation Record
Instrument Cluster Removal/InstallationShroud Side Member Removal [Panel Replacement]
Symbol Mark
Removal Procedure
1. Drill the 3 locations indicated by (A) shown in the figure.
2. Drill the 8 locations indicated by (B) and 2 locations indicated by (C) shown
in the figure.
NOTE:
When drilling the 3 locations indicated by (A) and 2 locations indicated
by (C) sh ...
Front Body Control Module (Fbcm)
Outline
Located at the front of the vehicle, the front body control module (FBCM)
performs numerous system controls for functions at the front of the vehicle.
Function
The front body control module (FBCM) controls the system based on the input/output
signals.
The fu ...
Roof Molding Removal
1. Insert a tape-wrapped flathead screwdriver in the position shown in the figure.
2. Rotate a tape-wrapped flathead screwdriver in the direction of the arrow in
the order of (1), (2) shown in the figure and remove the roof molding from the front
T-stud.
3. Rotate the roof molding in th ...