Symbol Mark

Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit properly.
4. Plug weld the 19 locations shown in the figure, then install the front side frame.

Front Side Frame (Partial Cutting) Removal [Panel Replacement]
Front Side Frame Removal [Panel Replacement]Pressure Control Solenoid [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
The pressure control solenoid adjusts the pressure control solenoid pressure
and controls the line pressure based on the control signal from the TCM.
Construction
The pressure control solenoid is installed to the solenoid control valve
body.
The pre ...
Engine Control System
Outline
L-jetronic*1 and D-jetronic*2 type detectors have been combined for intake
air amount detection, improving the accuracy of the intake air amount measurement.
MAF sensor adopted
MAP sensor adopted
IAT sensor No.1 and No.2 adopted
...
Oil Control Valve (OCV) Inspection [Skyactiv G 2.0]
Coil Resistance Inspection
1. Disconnect the negative battery cable..
2. Remove the plug hole plate..
3. Disconnect the OCV connector.
4. Measure the resistance between terminals A and B using an ohmmeter.
OCV coil resistance
6.9—7.5 ohms [20°C {68°F}]
If ...