1. Connect the M-MDS to the DLC-2.
2. After the vehicle is identified, select the following items from the initialization screen of the M-MDS.
a. Select “DataLogger”.
b. Select “Modules”.
c. Select “F_BCM”.
3. Select the applicable PID from the PID table.
4. Verify the PID data according to the directions on the screen.
NOTE:
The PID data screen function is used for monitoring the calculated value of input/output signals in the module. Therefore, if the monitored value of the output parts is not within the specification, it is necessary to inspect the monitored value of input parts corresponding to the applicable output part control. In addition, because the system does not display an output part malfunction as an abnormality in the monitored value, it is necessary to inspect the output parts individually.
When detecting DTCs, PIDs related to a malfunctioning system may not display even if the module is normal. Therefore, if a PID is not displayed, it is necessary to verify the DTC, perform malfunction diagnosis of the DTC that was detected, and do repairs.
On Board Diagnostic System Simulation Inspection [Fw6 A EL, Fw6 Ax EL]
PID/Data Monitor Inspection [Rear Body Control Module (Rbcm)]Control Valve Body [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
A direct linear solenoid has been adopted for the solenoid valve which contributes
to improved shift response, drive feel and reduced shift shock by the improved
precision of the hydraulic pressure control.
Construction
The control valve body consists of in ...
Shift Solenoid No.3 [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
Shift solenoid No.3 adjusts the hydraulic pressure in the R-3-5 brake circuit
based on the current demand from the TCM according to the vehicle conditions.
Construction
Shift solenoid No.3 is installed to the solenoid control valve body.
Shift solenoid ...
A Pillar Trim Removal/Installation
1. Partially peel back the seaming welt.
2. Take the shaded area shown in the figure, and pull the A-pillar trim in the
direction of the arrow (1) while detaching clip A, clips B.
3. Cut the lead wire connecting clips B and grommet using a nipper.
4. Pull the A-pillar trim in the dir ...