
Heated Oxygen Sensor (HO2 S) Inspection
HO2S Inspection
1. Connect the M-MDS to the DLC?2.
2. Switch the ignition ON (engine on).
3. Warm up the engine to normal operating temperature.
4. Access the following PIDs using the M-MDS..
VSS (Vehicle speed)
RPM (Engine speed)
O2S12 (HO2S output voltage)
5. D ...
Generator Control [Skyactiv G 2.0]
Outline
Idling stability has been improved by optimum control of generator voltage
according to engine operation and electrical load conditions.
The PCM determines the engine operation and electrical load conditions based
on the input signals from each control part and controls ...
Tire Pressure Monitoring System Initialization Procedure
Perform the tire pressure monitoring system initialization when the following
operations have been performed:
Tire pressures have been adjusted
Tires or wheels have been replaced
Tires have been rotated
DSC HU/CM replaced
DSC HU/CM ...