How to Use This ManualCharcoal Canister Inspection
U.S.A. And CANADA
Leakage inspection
1. Perform the following procedures:
Do not operate CV solenoid valve.
Assemble the hose used for inspection to port A.
Cover ports B and C with the caps.
CAUTION:
Do not apply a pressure 20 kPa {150 mmHg, 5.91 inHg} o ...
Corner Plate Installation [Panel Replacement]
Symbol Mark
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform
with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit p ...
Turn and Lane-Change Signals
NOTE
• If an indicator light stays on without
flashing or if it flashes abnormally, one of the turn signal bulbs may be burned
out.
• A personalized function is available to change
the turn indicator sound volume.
Refer to Personalization Features on .
Turn Signals
Move the signal lev ...