How to Use This ManualOil Control Valve (OCV) Inspection [Skyactiv G 2.0]
Coil Resistance Inspection
1. Disconnect the negative battery cable..
2. Remove the plug hole plate..
3. Disconnect the OCV connector.
4. Measure the resistance between terminals A and B using an ohmmeter.
OCV coil resistance
6.9—7.5 ohms [20°C {68°F}]
If ...
Front Door Latch Switch Inspection
1. Perform the front door glass preparation..
2. Disconnect the negative battery cable..
3. Remove the following parts:
a. Inner garnish.
b. Front door trim.
c. Front door glass.
d. Front door module panel.
e. Front door key cylinder.
f. Front door latch and lock actuator.
4. Verif ...
Front Door Checker Removal/Installation
CAUTION:
When the front door checker securing bolts are removed, the front door may
open until it contacts the front fender panel causing the front door and the
front fender panel to be damaged. Before removing the front door, overlap and
adhere the protective tape to the position s ...