Purpose/Function
Illuminates during the cruise control system operation to inform the driver that the cruise control system is operating.
Construction
Built into the instrument cluster.

Operation
Illuminates during the cruise control system operation.
The PCM sends a cruise set indicator light (green) illumination request to the instrument cluster via CAN communication.
Cruise Main Indicator Light (Amber)
ElectronicsDashboard Disassembly/Assembly
1. Disassemble in the order indicated in the table.
1
Wiring harness
2
Screw A
3
Screw B
4
Dashboard member
5
Screw C
6
Duct No.1
...
Main Relay [Skyactiv G 2.0]
Purpose/Function
Supplies power to each part.
Supplies battery voltage to each part based on the signals from the PCM even
though the ignition is switched on or off.
Construction
Installed to the relay and fuse block.
Operation
After the contact poin ...
Power Metal Oxide Semiconductor Field Effect Transistor (Power Mos Fet) Removal/Installation
[Full Auto Air Conditioner]
NOTE:
When removing the power MOS FET, perform the procedure in the posture shown
in the figure.
1. Disconnect the negative battery cable..
2. Remove the dashboard under cover..
3. Disconnect the connector.
4. Rotate the power MOS FET (2) while pressing the tab (1). ...