Body Sealing
Apply body sealer where necessary.
For locations where application of body sealer is difficult after installation, apply it before installation.

Application of Undercoating
Apply an undercoat to the required location of the body.

Application of Rust Inhibitor
Apply rust inhibitor (wax, oil, etc.) to the back of the welded areas.

Application of Dumping Sheet
Apply dumping sheet by heating with an infrared ray lamp.

A Pillar Trim Removal/Installation
B Pillar Lower Trim Removal/InstallationOil Seal (Coupling Component) Replacement
1. Drain the differential oil into a container.
2. Remove the coupling component..
3. Remove the oil seal from the differential carrier using a screwdriver or similar
tool.
4. Apply differential oil to the new oil seal lip.
5. Install the new oil seal to the differential carrier using the ...
Front Drive Shaft
Purpose, Function
A bell joint has been adopted for the wheel-side constant velocity joint,
reducing vibration and noise.
A tripod joint have been adopted for the differential side constant velocity
joint to reduce booming noise during high-speed driving and vibration when idlin ...
Variable Valve Timing Mechanism
Outline
Achieves optimum valve timing according to the driving conditions by the
variable valve timing mechanism changing the phases of the camshaft.
An electric type variable valve timing mechanism on the intake side and a
hydraulic pressure type on the exhaust side has been ad ...