Sunroof Switch Removal/Installation
Sunroof Switch InspectionStarter Relay [Skyactiv G 2.0]
Purpose, Function
The starter relay supplies power to the starter by receiving the signal from
the PCM.
Construction
The starter relay is installed to the relay and fuse block.
Operation
The contact point is on when the voltage is supplied to the coil based on
...
Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Continuity Inspection
1. Verify that the CPP switch is installed properly..
2. Disconnect the negative battery cable..
3. Disconnect the CPP switch connector.
4. Verify that the continuity between CPP switch terminals A and B when the clutch
pedal is depressed and when it is released is acc ...
Fuel Gauge
Purpose
The fuel gauge notifies the user of the amount of remaining fuel.
Function
The instrument cluster calculates the amount of fuel in the fuel tank based
on the following CAN signals and displays the fuel gauge segments.
Fuel gauge sender unit voltage signal ...