1. Connect battery positive voltage to blower motor terminal B, connect terminal A to ground, and then verify its operation.

If there is any malfunction, replace the blower motor.
Blower Motor Inspection [Full Auto Air Conditioner]
Blower Motor Removal/Installation [Full Auto Air Conditioner]Electronic Spark Advance Control [Skyactiv G 2.0]
Outline
Controls ignition to optimum timing according to engine operation conditions.
Serviceability has been improved by eliminating the necessity of ignition
timing adjustment.
The PCM determines the engine operation conditions based on input signals
from each sensor a ...
Propeller Shaft On Vehicle Inspection
Joint Area Excessive Play Inspection
1. Shake the universal joint by hand and verify that there is no excessive play.
2. If there is any excessive play, replace the propeller shaft..
Propeller Shaft Runout Inspection
CAUTION:
Do not rotate the propeller shaft using engine force wh ...
Fuel Injector Relay
Purpose, Function
Supplies power to the PCM for the fuel injector and spill valve control solenoid
valve operation.
Construction
The fuel injector relay is installed in the relay and fuse block.
Operation
When the ignition is switched ON, the battery voltage ...