1. Measure the propeller shaft center runout using the dial gauge.

If it exceeds the maximum specification, replace the propeller shaft as a single component.
0.8 mm {0.031 in}
2. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

If it is not within the specification, replace the propeller shaft.
0.29—1.47 N·m {3.0—14.9 kgf·cm, 2.6—13.0 in·lbf}
Intermediate Shaft Removal/Installation
Propeller Shaft On Vehicle InspectionGenerator [Skyactiv G 2.0]
Purpose, Function
The generator operates by obtaining drive force from the engine via the drive
belt and generates the required electricity for electronic devices.
Construction
The generator is installed on the engine left front side.
Output control is perfor ...
Miller Cycle Engine
Outline
The Miller cycle engine is a high-efficiency engine which achieves high fuel
economy performance by obtaining a high-expansion ratio.
The Miller cycle engine achieves a high-expansion ratio without increasing
its effective compression ratio by retarding the intake air va ...
Push Button Start Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the meter hood..
3. While pressing the push button start tab in the direction of the arrow (1)
shown in the figure, push out the push button start in the direction of the arrow
(2) shown in the figure to detach the push button start tab fr ...