Purpose/Function
Detects the connection status of the clutch.
Construction
Installed on the clutch pedal.

An ON/OFF type switch has been adopted.
Operation
Inputs the CPP switch on/off signal to the PCM.

The contact point is on and voltage is output when the clutch pedal is engaged, and off when the clutch pedal is not engaged.

Fail-safe
Function not equipped.
Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Clutch Pedal Position Switch Removal/Installation [C66 M R]Non Return Valve Inspection
WARNING:
Fuel is very flammable liquid. If fuel spills or leaks from the pressurized
fuel system, it will cause serious injury or death and facility breakage. Fuel
can also irritate skin and eyes. To prevent this, always complete the “Fuel
Line Safety Procedure”, while referring ...
Center-Rear Position Seat Belt
Before using the center-rear lap/shoulder belt make sure tongue (A) and anchor
buckle (B) are fastened.
Fastening the Seat Belt
1. Grasp the seat belt tongue (C).
2. Slowly pull out the lap/shoulder belt.
3. Insert the seat belt tongue (C) into the seat belt buckle (D) until you hear
a cli ...
Starter Relay [Skyactiv G 2.0]
Purpose, Function
The starter relay supplies power to the starter by receiving the signal from
the PCM.
Construction
The starter relay is installed to the relay and fuse block.
Operation
The contact point is on when the voltage is supplied to the coil based on
...