Purpose/Function
Detects the connection status of the clutch.
Construction
Installed on the clutch pedal.

An ON/OFF type switch has been adopted.
Operation
Inputs the CPP switch on/off signal to the PCM.

The contact point is on and voltage is output when the clutch pedal is engaged, and off when the clutch pedal is not engaged.

Fail-safe
Function not equipped.
Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Clutch Pedal Position Switch Removal/Installation [C66 M R]Passenger Compartment Temperature Sensor Removal/Installation [Full Auto Air
Conditioner]
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Front scuff plate (driver-side).
b. Front side trim (driver-side).
c. Switch panel.
d. Decoration panel.
e. Shift lever knob (MTX).
f. Front console box.
g. Shift panel.
h. Upper panel.
i. Rear console. ...
Shroud Side Member Removal [Panel Replacement]
Symbol Mark
Removal Procedure
1. Drill the 3 locations indicated by (A) shown in the figure.
2. Drill the 8 locations indicated by (B) and 2 locations indicated by (C) shown
in the figure.
NOTE:
When drilling the 3 locations indicated by (A) and 2 locations indicated
by (C) sh ...
Dashboard Disassembly/Assembly
1. Disassemble in the order indicated in the table.
1
Wiring harness
2
Screw A
3
Screw B
4
Dashboard member
5
Screw C
6
Duct No.1
...