Purpose/Function
The 2-6 brake locks the rear internal gear and reduction planetary carrier while in 2GR and 6GR.
Construction
The 2-6 brake consists of the following parts shown in the figure.

The driven plate of the 2-6 brake does not rotate because it is connected to the end cover component.

The driven plate of the 2-6 brake is engaged with the 2-6 brake hub and rear internal carrier, and the rear internal carrier is engaged with the reduction planetary carrier through the rear internal gear. Therefore, the rear internal gear and reduction planetary gear are locked by the 2-6 brake.

For the 2-6 brake piston, a compact and highly reliable bonded seal piston has been adopted in which the piston and seal are molded together.
Operation
When hydraulic pressure is applied to the 2-6 brake piston, the drive plate and driven plate are pressure bonded to lock the rear internal gear and reduction planetary carrier.

General
Brake Fluid Air BleedingShift And Select Mechanism [C66 M R]
Purpose, Function
The shift and select mechanism moves the shift fork to change gears according
to the operation of the shift lever in the cabin.
Construction
Shift control module
The moving parts of the shift control module are vertically positioned..
In th ...
Front Buckle Removal/Installation
Driver-side
1. Disconnect the negative battery cable and wait for 1 min or more..
2. Remove the front seat..
3. Disconnect the front buckle connector.
4. Remove the bolt.
5. Remove the front buckle.
6. Install in the reverse order of removal.
Passenger-side (with buckle switch) ...
Oil Seal (Coupling Component) Replacement
1. Drain the differential oil into a container.
2. Remove the coupling component..
3. Remove the oil seal from the differential carrier using a screwdriver or similar
tool.
4. Apply differential oil to the new oil seal lip.
5. Install the new oil seal to the differential carrier using the ...