Purpose
The system piping connects each related part of the refrigerant system.
Construction
Block-type piping has been adopted to the pipe connection, improving the efficiency of piping related servicing.
The pipes in the piping system consist of the following parts.
Cooler hose (HI)
Cooler hose (LO)
Cooler pipe
The pipes in the piping system are made of aluminum alloy and the hoses are made of rubber (flexible hose).
A high-pressure charging valve is located on the cooler pipe (HI) and a low-pressure charging valve is located on the cooler pipe (LO).

Fail-safe
Function not equipped.
Refrigerant Charging
Refrigerant Line Removal/InstallationShift Solenoid No.3 [Fw6 A EL, Fw6 Ax EL]
Purpose/Function
Shift solenoid No.3 adjusts the hydraulic pressure in the R-3-5 brake circuit
based on the current demand from the TCM according to the vehicle conditions.
Construction
Shift solenoid No.3 is installed to the solenoid control valve body.
Shift solenoid ...
Brake Pedal Removal/Installation
CAUTION:
The clearance between the brake switch and the brake pedal is automatically
adjusted to the correct amount when the brake switch is inserted into the installation
hole on the brake pedal and rotated to fix in place. If the brake switch is
not properly installed, the clearan ...
Panel Light
Purpose
The panel light adjusts the instrument cluster and steering switch illumination
brightness.
Function
The instrument cluster adjusts the brightness of the following illumination
lights when a TNS illumination signal sent via CAN transmission from the front
body co ...