Purpose
The system piping connects each related part of the refrigerant system.
Construction
Block-type piping has been adopted to the pipe connection, improving the efficiency of piping related servicing.
The pipes in the piping system consist of the following parts.
Cooler hose (HI)
Cooler hose (LO)
Cooler pipe
The pipes in the piping system are made of aluminum alloy and the hoses are made of rubber (flexible hose).
A high-pressure charging valve is located on the cooler pipe (HI) and a low-pressure charging valve is located on the cooler pipe (LO).

Fail-safe
Function not equipped.
Refrigerant Charging
Refrigerant Line Removal/InstallationClock Spring Adjustment [Two Step Deployment Control System]
1. Set the front wheels straight ahead.
CAUTION:
The clock spring will break if over?wound. Do not forcibly turn the clock
spring.
2. Turn the clock spring clockwise until it stops.
3. Turn the clock spring counterclockwise approx. 2 turns.
4. Align the mark on the clo ...
Front Seat Side Cover Removal/Installation
WARNING:
Handling a side air bag improperly can accidentally operate (deploy) the
air bag, which may seriously injure you. Read the service warnings in the Workshop
Manual before handling the front seat (side air bag integrated)..
If the sliding mechanisms on both sides are ...
Parking Brake Lever Inspection
Stroke Inspection
1. Pump the brake pedal a few times.
2. Pull the parking brake lever two to three times.
3. Inspect the parking brake stroke by slowly pulling at point A 50 mm {2.0
in} from the end of the parking brake lever with a force of 98 N {10 kgf,
22 lbf} and counting the number of ...