Purpose
The system piping connects each related part of the refrigerant system.
Construction
Block-type piping has been adopted to the pipe connection, improving the efficiency of piping related servicing.
The pipes in the piping system consist of the following parts.
Cooler hose (HI)
Cooler hose (LO)
Cooler pipe
The pipes in the piping system are made of aluminum alloy and the hoses are made of rubber (flexible hose).
A high-pressure charging valve is located on the cooler pipe (HI) and a low-pressure charging valve is located on the cooler pipe (LO).

Fail-safe
Function not equipped.
Refrigerant Charging
Refrigerant Line Removal/InstallationTorque Box Installation [Panel Replacement]
Symbol Mark
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform
with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit p ...
Clutch Fluid Leakage Inspection [C66 M R]
CAUTION:
Do not allow clutch fluid to get on a painted surface. Clutch fluid contains
properties which can dissolve the paint. If clutch fluid gets on a painted surface,
wash it off with water immediately and wipe the area off completely.
1. Verify reserve tank cap is on tight.
...
Intake Manifold Vacuum Inspection
1. Disconnect the evaporative hose No.3 (purge solenoid valve side) and install
the vacuum gauge..
2. Verify that the intake air hoses are installed securely.
3. Warm up the engine.
4. Measure the intake manifold vacuum while idling (no load) using the vacuum
gauge.
If not within t ...