NOTE:
The TCS OFF switch is integrated with the cluster switch.
Refer to SWITCH PANEL REMOVAL/INSTALLATION to remove the cluster switch.
1. Remove the cluster switch from the switch panel..
2. Install in the reverse order of removal.
Tcs Off Switch Inspection
Tcs Off Switch, Tcs Off Indicator LightLiftgate Removal/Installation
WARNING:
Removing the stay damper, liftgate hinge securing bolt, or liftgate without
supporting the liftgate may cause the liftgate to fall off and injure you. When
removing the stay damper, liftgate hinge, or liftgate, always use two persons
to perform the work.
1. Disconnect ...
Electric Variable Valve Timing Relay [Skyactiv G 2.0]
Purpose, Function
The electric variable valve timing actuator relay supplies power to the electric
variable valve timing motor/driver after receiving the signal from the PCM.
Construction
The electric variable valve timing actuator relay is installed to the relay
block..
...
Check Fuel Cap Warning Light
Purpose/Function
The check fuel cap warning light is built into the instrument cluster.
If the PCM detects that the fuel cap is open, the light illuminates to warn
the driver that the fuel cap is open.
Construction
Built into the instrument cluster.(See INSTRUMENT CLUS ...