1. Install the manifold gauge.
2. Verify the high-pressure side reading of the manifold gauge.
3. Measure the terminal voltage at PCM terminal 2BB, 2AX and 2AJ
4. Using the graph below, measure and verify the terminal voltages at 2AX.
5. Follow the PCM inspection when measuring the other terminal voltages..
Terminal 2BB: Approx. 5 V (Ignition switch on)
Terminal 2AJ: 1.0 V or less
If the each voltage is not normal, inspect the related wiring harness.
If there is any malfunction, replace the related wiring harness.
If wiring harness is normal, replace the refrigerant pressure sensor.
Seat Belt
Fastening the Seat Belt
Position the lap belt as low as possible, not on the abdominal area, then adjust
the shoulder belt so that it fits snugly against your body.
Unfastening the Seat Belt
Depress the button on the seat belt buckle.
If the belt does not fully retract, pull it out and che ...
Outside the United States/Canada
Government regulations in the United States/Canada require that automobiles meet
specific emission regulations and safety standards. Therefore, vehicles built for
use in the United States/Canada may differ from those sold in other countries.
The differences may make it difficult or even impossi ...
Glove Compartment Removal/Installation
1. Push the glove compartment in the direction of the arrow (1) and remove hooks
A.
2. Pull the stay damper in the direction of the arrow (2) shown in the figure
and remove the hook B.
CAUTION:
If the glove compartment is closed without being joined to the stay damper,
the sta ...