1. Install the manifold gauge.
2. Verify the high-pressure side reading of the manifold gauge.
3. Measure the terminal voltage at PCM terminal 2BB, 2AX and 2AJ
4. Using the graph below, measure and verify the terminal voltages at 2AX.
5. Follow the PCM inspection when measuring the other terminal voltages..
Terminal 2BB: Approx. 5 V (Ignition switch on)
Terminal 2AJ: 1.0 V or less
If the each voltage is not normal, inspect the related wiring harness.
If there is any malfunction, replace the related wiring harness.
If wiring harness is normal, replace the refrigerant pressure sensor.
PCM Inspection
Without Using the M-MDS
NOTE:
Because the PCM uses a waterproof connector, the inspection for the voltage/wave
pattern cannot be performed. The following values are for reference.
Terminal voltage table (Reference)
Terminal
Signal
C ...
Plug Hole Plate Removal/Installation
CAUTION:
If the rubber on only one side of the plug hole plate front is lifted up,
it could damage the adapter at the location shown in the figure. When removing
the plug hole plate, lift up the rubbers at the same time.
Removal
1. Pull up the front part of the plug hole p ...
Keyless Entry System
This system uses the key buttons to remotely lock and unlock the doors and the
liftgate.
The system can start the engine without having to take the key out of your purse
or pocket.
It can also help you signal for attention.
Operating the theft-deterrent system is also possible on theft-deterr ...