Symbol Mark
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit properly.
4. Plug weld the 8 locations indicated by (A) shown in the figure, then install the rear side frame.
5. Cut and join the area location indicated by (B) shown in the figure.
6. Plug weld the 4 locations indicated by (C) shown in the figure, then install the part of trunk floor panel.
7. Plug weld the 35 locations indicated by (D) shown in the figure, then install the floor side panel No.2.
Ignition Coil Inspection [Skyactiv G 2.0]
Ignition Coil Inspection
1. Perform the spark test and identify the malfunctioning cylinder..
2. Replace the ignition coil of the malfunctioning cylinder with that of a normal
cylinder, and perform the spark test again..
If the spark is not normal due to a malfunctioning ignition coil, ...
Interior Care
WARNING
Do not spray water in the cabin:
Splashing water on electrical parts such as the audio unit and switches is dangerous
as it could cause a malfunction or a fire.
Dashboard Precautions
Prevent caustic solutions such as perfume and cosmetic oils from contacting the
dashboard. They will ...
Crankshaft Position (CKP) Sensor
Purpose/Function
Detects the crankshaft speed as basic information for mainly determining
the fuel injection timing and ignition timing.
Detects the crankshaft speed and inputs it to the PCM as a CKP signal.
Construction
Installed on the side of the cylinder block (ri ...