Outline
Supplies power to each part by switching the main relay on/off at the optimal timing according to the vehicle conditions.
Block Diagram

Operation
When the ignition is switched ON, the main relay turns on and electrical power is supplied to each sensor and device.
When the ignition is switched off from ON, an on-request signal is received from each control (such as drive-by-wire control, electric variable valve timing control) and the main relay turns on for a specified period.
Front Body Control Module (Fbcm) Removal/Installation
Multiplex Communication SystemInstrumentation/Driver Info. Personalization Features Setting Procedure
1. Connect the M-MDS to the DLC-2.
2. After vehicle identification, select the following from the M-MDS initialization
screen.
a. “Module programming“
b. “Programmable Parameters”
3. Select menu in the “IC”.
4. Select an item name, and than select option.
Instrument cluster ...
Canister Vent (Cv) Solenoid Valve
U.S.A. And CANADA
Purpose, function
Seals the atmosphere side of the charcoal canister during EVAP leak check
monitoring.
Construction
Included in the charcoal canister.
The CV solenoid valve is consists of O-rings.
Operation
According to the ...
Panel Light Control Indicator Alarm
Purpose
The panel light control indicator alarm notifies the driver that the panel
light brightness is either at maximum or minimum.
Function
If the panel light control switch is in the maximum rotation position right
or left when the TNS switch ON signal (TNS and headlight ...