Outline
Supplies power to each part by switching the main relay on/off at the optimal timing according to the vehicle conditions.
Block Diagram

Operation
When the ignition is switched ON, the main relay turns on and electrical power is supplied to each sensor and device.
When the ignition is switched off from ON, an on-request signal is received from each control (such as drive-by-wire control, electric variable valve timing control) and the main relay turns on for a specified period.
Front Body Control Module (Fbcm) Removal/Installation
Multiplex Communication SystemAuto Leveling Sensor Inspection
1. Disconnect the negative battery cable..
2. Remove the auto leveling sensor..
3. Prepare three dry cell batteries (1.5 V).
4. Connect the three dry cell batteries in a series.
5. Connect the positive pole of the dry cell battery to auto leveling sensor
terminal C, and the negative po ...
General Procedures (Suspension)
Wheel and Tire Installation
1. When installing the wheels and tires, tighten the wheel nuts in a criss-cross
pattern to the following tightening torque.
Tightening torque
108—147 N·m {12—14 kgf·m, 80—108 ft·lbf}
Suspension Links Removal/Installation
1. For the ...
Power Outer Mirror Inspection
Mirror Glass Adjustment
1. Disconnect the negative battery cable..
2. Remove the following parts:
a. Inner garnish.
b. Front door trim.
c. Power outer mirror.
3. Apply battery positive voltage and connect the ground to the power outer mirror
terminals and inspect the power outer mirror ...