Outline
Supplies power to each part by switching the main relay on/off at the optimal timing according to the vehicle conditions.
Block Diagram

Operation
When the ignition is switched ON, the main relay turns on and electrical power is supplied to each sensor and device.
When the ignition is switched off from ON, an on-request signal is received from each control (such as drive-by-wire control, electric variable valve timing control) and the main relay turns on for a specified period.
Front Body Control Module (Fbcm) Removal/Installation
Multiplex Communication SystemClutch Unit Removal/Installation [C66 M R]
1. Disconnect the negative battery cable..
2. Remove the MTX..
3. Remove in the order indicated in the table.
4. Install in the reverse order of removal.
5. Add the specified amount of specified transaxle oil..
1
Boot
2
Clutch release ...
Synchronizer Mechanism [C66 M R]
Purpose, Function
For smooth gear changes, the synchronizer mechanism synchronizes the rotation
of the engaging area and engages gears.
Construction
Detent ball-type synchronizer key
A detent ball-type synchronizer key has been adopted for the synchronizer
mechanism ex ...
Battery Inspection [Skyactiv G 2.0]
WARNING:
Since battery acid is toxic, be careful when handling the battery.
Since battery acid is highly corrosive, be careful not to allow it to contact
clothing or the vehicle.
In case battery acid contacts skin, eyes, or clothing, flush it immediately
with running wa ...