Pilot Bearing Inspection [C66 M R]
GeneralRelay And Fuse Block Removal/Installation
1. Remove the battery tray..
2. Remove the air cleaner case..
3. While pressing the relay and fuse block upper cover tab in the direction of
the arrow (1) shown in the figure, lift up the relay and fuse block upper cover
in the direction of the arrow (2) to detach the relay and fuse block up ...
Shift Point Control (Manual Shift Control) [Fw6 A EL, Fw6 Ax EL]
Outline
The TCM operates the manual shift control when the M position is selected.
If the M position is selected, manual shifting is prioritized according to
the driver’s shift up/shift down operation. However, to assure driving safety
and protect the ATX, minimum automatic sh ...
Electric Variable Valve Timing Relay [Skyactiv G 2.0]
Purpose, Function
The electric variable valve timing actuator relay supplies power to the electric
variable valve timing motor/driver after receiving the signal from the PCM.
Construction
The electric variable valve timing actuator relay is installed to the relay
block..
...