Symbol Mark

Removal Procedure
1. Drill the 27 locations shown in the figure.

2. Remove the corner junction.
Corner Junction Installation [Panel Replacement]
Electric Variable Valve Timing Relay [Skyactiv G 2.0]Clutch Pedal Position (CPP) Switch Inspection [Skyactiv G 2.0]
Continuity Inspection
1. Verify that the CPP switch is installed properly..
2. Disconnect the negative battery cable..
3. Disconnect the CPP switch connector.
4. Verify that the continuity between CPP switch terminals A and B when the clutch
pedal is depressed and when it is released is acc ...
Power Metal Oxide Semiconductor Field Effect Transistor (Power Mos Fet) Removal/Installation
[Full Auto Air Conditioner]
NOTE:
When removing the power MOS FET, perform the procedure in the posture shown
in the figure.
1. Disconnect the negative battery cable..
2. Remove the dashboard under cover..
3. Disconnect the connector.
4. Rotate the power MOS FET (2) while pressing the tab (1). ...
Battery Runs Out
Jump-Starting
Jump-starting is dangerous if done incorrectly. So follow the procedure carefully.
If you feel unsure about jump-starting, we strongly recommend that you have a competent
service technician do the work.
WARNING
Follow These Precautions Carefully:
To ensure safe and correct ...