Symbol Mark

Removal Procedure
1. Drill the 27 locations shown in the figure.

2. Remove the corner junction.
Corner Junction Installation [Panel Replacement]
Electric Variable Valve Timing Relay [Skyactiv G 2.0]B Pillar Lower Trim Removal/Installation
1. Remove the front scuff plate..
2. Remove the rear scuff plate..
3. Partially peel back the seaming welt.
4. Take the shaded area shown in the figure, and pull the B-pillar lower trim
in the direction of the arrow in the order of (1), (2) while detaching hooks A,
pins B.
5. Take th ...
Rear Stabilizer Control Link Inspection
1. Remove the rear stabilizer control link..
2. Inspect for bending or damage. If there is any malfunction, replace the rear
stabilizer control link.
3. Rotate the ball joint stud 10 times and shake it side to side 10
times.
4. Measure the ball-joint rotational torque using an Allen wrench ...
Generator Control [Skyactiv G 2.0]
Outline
Idling stability has been improved by optimum control of generator voltage
according to engine operation and electrical load conditions.
The PCM determines the engine operation and electrical load conditions based
on the input signals from each control part and controls ...