Chevrolet Spark manuals

Mazda CX-5 Service & Repair Manual: Auto Dimming Mirror Inspection

Mazda CX-5 Service & Repair Manual / Body / Mirrors / Auto Dimming Mirror Inspection

1. Measure the voltage at each terminal.

Terminal Voltage Table (Reference)



Terminal

Signal name

Connected to

Measured condition

Voltage (V)

Inspection item(s)

A

B

IG1

C/U IG1 15A fuse

Switch the ignition ON (engine on or off)

B+

  • C/U IG1 15A fuse

  • Related wiring harnesses

Switch the ignition OFF (LOCK)

1.0 or less

C

D

R position signal

Rear body control module (RBCM)

R position

B+

  • Rear body control module (RBCM)

  • Related wiring harnesses

Other than R position

1.0 or less

E

F

GND

Body ground

Under any condition

1.0 or less

  • Related wiring harnesses

G

H

I

J

Power supply

ROOM 15 A fuse

Under any condition

B+

  • ROOM 15 A fuse

  • Related wiring harnesses


Auto Dimming Mirror
Purpose The automatic glare prevention rearview mirror prevents the driver from being affected by light from vehicles at the rear. Structural view System wiring diagram Funct ...

Auto Dimming Mirror Removal/Installation
1. Disconnect the negative battery cable.. 2. Remove the screw B. 3. Remove the auto-dimming mirror in the direction of arrow (1) shown in the figure. 4. Detach tabs while push the cov ...

Other materials:

Wheel Hub, Steering Knuckle Inspection
Wheel Bearing Excessive Play Inspection 1. Install the magnetic base and dial gauge as shown in the figure and measure the wheel bearing axial excessive play. If it exceeds the maximum specification, replace the wheel hub bearing. Front wheel bearing maximum play 0 ...

Shift And Select Mechanism [C66 M R]
Purpose, Function The shift and select mechanism moves the shift fork to change gears according to the operation of the shift lever in the cabin. Construction Shift control module The moving parts of the shift control module are vertically positioned.. In th ...

Refrigerant Pressure Sensor Inspection [Full Auto Air Conditioner]
1. Install the manifold gauge. 2. Verify the high-pressure side reading of the manifold gauge. 3. Measure the terminal voltage at PCM terminal 2BB, 2AX and 2AJ 4. Using the graph below, measure and verify the terminal voltages at 2AX. 5. Follow the PCM inspection when measuring the other te ...

© 2016-2025 Copyright www.mcx5.org